Pull construction

At a distance of ca. 6.0 m apart, steel supports have to be provided between one binder and the next inside your building. These supports are used to install a continuous shaft with top-mounted rope drums. Wire ropes 8 mms thick create a connection between the rope drums and the crane track door frame.  (For more see Frame construction)

Pull construction
Pull construction
Pull construction

Um den Schutz Ihrer Daten zu gewährleisten, haben wir ein neues Virenschutzprogramm.
Falls Ihre E-Mail nicht ankommt, bitte versuchen Sie es erneut.
Oder rufen Sie uns an

02052/8990

New Anti-Virus software. Some e-mail might not reach our server.
Please send them again or call us.

+492052/8990